You are here:  Home > Transfer Switches

Transfer Switches

     Email to a Friend    Bookmark & Share  
 

RTS Automatic Transfer Switch

 
DESCRIPTION

Generac RTS automatic transfer switches are designed to operate with the digital control used on air-cooled generators and the Generac R100 control used on liquid cooled QT series gaseous generators from 8 kW through 60 kW.
 
The RTS transfer switch will operate only with the Generac R100 controller.
 
The 100, 200 and 400amp open transition switches are available in single and 3 phase configurations for 120/240, 120/208 and 120/240 3 phase at 100, 200 and 400 amp ratings and 277/480 at the 100 and 200 amp rating.
 
It is available as a stand-alone switch or for single phase with a built in 8, 10, 12, 14 or 16-circuit load center to supply only those circuits that are essential during an emergency.
 
All standard and load center transfer switches are UL and CUL Listed and suitable for use as optional standby systems (NEC702).
 
 
 
 

100amp Transfer Switch

 
DESCRIPTION
 
This 100 amp Transfer switch has an integrated load center for picking up the emergency circuits.
 
It is especially useful where the main service is large and only a portion of the building load will be served by the generator.
 
Internal point to point wiring for the generator connection and the 8, 10, 12, 14 or 16 circuits and circuit breakers from the main distribution point are included.
 

Power Manager

 
DESCRIPTION
 
The Generac Service Entrance Rated Transfer Switches are available in 100, 200 and 400 amp ratings in single phase applications.
 
The switches are UL 1008 listed with 100, 200 or 400 amp UL rated Circuit Breakers on both the Utility and Generator side of the transfer contactor for full downstream protection.
 
The enclosure is rated for NEMA 3R installation and is fully protected from the elements.
 
 

GenReady Advanced Load Center

 
DESCRIPTION
 
What is GenReady?
Generac's GenReady load center (circuit breaker box) is a hybrid panel that separates the electrical circuits of your home... those that will be backed-up by a generator, and those that will not.

Installing the GenReady load center during construction makes your home ready for the installation of a standby generator, saving you thousands in equipment and labor charges compared to retrofit generator installations.

Easiest, most economical generator installation
  • No need for additional installation labor
  • No need for extra sub-panels
  • No need for a transfer switch

Spec Sheet

 © 2006 - 2012   Diversified Contractors SiteBuilder by AccuNet